FABRICATION OF SJQ-A TOPSIDES CLIENT : SABAH SHELL PETROLEUM COMPANY LIMITED CONTACT NO : 600501 AWARD DATE : 15 MAY 2009
The SJQ-A Topside scope covers the engineering, procurement, fabrication, inspection, testing and onshore commissioning, weighing, loadout and seafastening. The SJQ-A Topside is a 3-Deck steel structure standing on the 4-legged jacket. The topsides designed to be installed as a single lift with an estimated weight of 2100 MT.
The SJP-A/SJQ-A Interplatform Bridge covers the engineering, procurement, fabrication, inspection, testing and onshore commissioning, weighing, load and seafastening. The bridge is a 3- chord steel structure with an approximate length of 50 meters. The bridge is fixed at SJP-A platform and the sliding end at SJQ-A Platform.
Project by: Oil and Gas Unit