MAJOR SCOPE OF WORKS INVOLVES ENGINEERING, PROCUREMENT AND CONSTRUCTION (EPC) – TIMI PROJECT

  1. EPC Timi Project consist of 3 modules with the respective tonnages.
    Jacket – 3,385 MT
    Topside – 836 MT
    Brownfield Integrated Module (BIM) – 527 MT
  2. Timi Wellhead Platform (Topside)
    Gas field development
    3 slots for 2 development wells
  3. Timi Substructure
    150m 4-legged Jacket (longest substructure in Sarawak waters)