ENGINEERING,PROCUREMENT AND CONSTRUCTION (EPC) OF SOUTH ACIS PRODUCTION (SA-PA) SUBSTRUCTURE, SOUTH ACIS UTILITY (SA-AA) SUBSTRUCTURE, SA-PA WELLHEAD TEMPLATE (WHT) AND SA-PA WHT MODULE SUPPORT FRAME (MSF) FOR MURPHY’S SARAWAK SK309/311 SPSA DEV. PROJECT

EPC SOUTH ACIS (SA-PA) & (SA-AA) SUBSTRUCTURE

TENDER NO : MURPHY/P1108

CLIENT : MURPHY SARAWAK OIL CO LTD

TONNAGE: 1,720 MT

Project Brief

THE SOUTH ACIS FIELD IS LOCATED IN BLOCK SK311 & COMPRISES OF A PRODUCTION PLATFORM (SA-PA) BRIDGE LINKED TO UTILITY PLATFORM (SA-AA) AND A SATELLITE PLATFORM (SA-SA)

LOCATED APPROX. 17KM FROM WEST PATRICIA IN A WATER DEPTH OF 35M

THESE FACILITIES MAKE PROVISION FOR THE TIE-IN OF THE FUTURE PLANNED PERMAS & ENDAU FIELD LOCATED APPROXIMATELY 38 KM NORTH WEST OF SA-PA.