|
HAPPENING: Friday, 19 March 2010, BROOKE DOCKYARD ACHIEVED SECOND HSE MILESTONES OF 800,000 MANHOURS WITHOUT LTI

Brooke Dockyard and Engineering Works Corporation achieved their second manhours milestones of 800,000 man-hours without Lost Time Incident (LTI) for St Joseph Redevelopment Project on 19th March 2010.
...
Read more
HAPPENING: Tuesday,14 April 2009, B11 LIVING QUARTERS LOADOUT CEREMONY LAUNCHED BY DEPUTY CHIEF MINISTER OF SARAWAK, DATUK PATINGGI TAN SRI (DR) ALFRED JABU ANAK NUMPANG

Recently, Brooke Dockyard has successfully loaded out the B11 Living Quarters Module and Helideck project at Brooke Dockyard Sejingkat, Jalan Bako.Kuching.
YB Datuk Patinggi (Dr.) Alfred Jabu anak Numpang, Deputy Chief Minister of Sarawak was give ...
Read more
HAPPENING: Saturday, 6th DECEMBER 2008, DEPUTY CHIEF MINISTER OF SARAWAK VISIT AT BROOKE DOCKYARD

Brooke Dockyard received an official visit from YB Datuk Patinggi Tan Sri (Dr) Alfred Jabu anak Numpang, Deputy Chief Minister of Sarawak at fabrication yard, Sejingkat , Jalan Bako.
...
Read more
PROJECT: Baram Compression and Production Platform BAKP-B Module 2 & 3, Module Support Frame (MSF) and Flare Boom

Client : PETRONAS CARIGALI
Award Date : 12 October 2004
Completion Date
: 11 September (MSF & Flare Boom)
: 11 October 2005 ( M2 & M3)
Tonnage : 3,100MT ...
Read more
PROJECT: Steel Hulled 38 meter Hydrographic Survey Vessel

Project Brief
The KBA Permata Hidro is part of the Buoy and Lights Dues Board to
modernize and to renew the Sarawak Marine Department fleet as KBA Datu
and KBA Merpati is nearing the end of their service age. The vessel shall be
operated by ...
Read more
|
|
|
Main Yard
Sejingkat Yard is Brooke Dockyard’s main fabrication yard. This 20-acre site is strategically located at the deep-water front at Sejingkat, near to the new Senari Port. This Yard is geared for heavy engineering works inclusive of shipbuilding, oil & gas and other heavy engineering works.With the current status of yard upgrading the total tonnage capacity achievable is 8,500 tonnes
OVERALL YARD CAPACITY: • Total Yard Area : 82,000 meter sq • Open Fabrication Area : 63,500 meter sq • Proven Yard Capacity : 8,500 mt
FACILITIES AVAILABLE : • 4,000 Matric Tonnes Loadout Jetty • Engineering Office completed with Autocad,PDMS and Workshops • Wide range qualified WPS including exotic material (super duplex)
Extended Structural Workshop
Market Street Yard
The origin of Brooke Dockyard. Currently caters mainly for ship repair works for medium sized vessels.
Last updated: 20/04/2010

|
|