PROJECT LIST

 

Oil and Gas Unit
FABRICATION OF SJQ-A LIVING QUARTERS MODULE & HELIDECK
FABRICATION OF SJQ-A SUBSTRUCTURE
FABRICATION OF SJQ-A TOPSIDES
FABRICATION SERVICES FOR SEDERI TIE-IN MODIFICATIONS
ENGINEERING PROCUREMENT CONSTRUCTION OF B11 LIVING QUATERS MODULE & HELIDECK
FABRICATION OF F23 LIVING QUARTERS MODULE AND HELIDECK
FABRICATION OF F6 LIVING QUARTERS MODULE AND HELIDECK
FABRICATION OF JERNEH-B PLATFORM AND SUBSTRUCTURE
FABRICATION OF SFJT-E SATELLITE PLATFORM & PREFAB. WORKS FOR M3S & G7
Baram Compression and Production Platform BAKP-B Module 2 & 3, Module Support Frame (MSF) and Flare Boom
FABRICATION OF WP-IA TOPSIDES
SFJT-C TOPSIDES
SFJT-C SUBSTRUCTURE
FABRICATION OF SFK-A SUBSTRUCTURE
Serai Subsea Production Manifold, Pressure Vessel & Associated Tie-In Materials
MLNG TIGA PIPELINE PROJECT – SLUGCATCHER III FACILITIES
MLNG TIGA PLANT – CONDENSATE STABILISATION TRAINS
BK-B(BR-C) & BK-C WELLHEAD RISER PLATFORMS AND JACKET
Jintan (JNDRA) Topsides
ANGSI-B Topsides
D35 JT-C Topsides
ST. Joseph Compression Module
MALONG JACKET
MALONG TOPSIDES
Marine Engineering Unit
FABRICATION OF SG NYELONG BRIDGE
42 meter Double Ended Ferry
Steel Hulled 38 meter Hydrographic Survey Vessel
Multi Mission Vessel
Land-based Engineering Unit
Construction Works for the Remaining Works of Durin Bridge, Batang Rajang, Sibu.
Sg. Meradong Bridge

 

 

PROJECTS


BK-B(BR-C) & BK-C WELLHEAD RISER PLATFORMS AND JACKET

The first EPC Project undertaken by Brooke Dockyard

Client : Talisman Malaysia Co. Ltd
Award Date : 7th August 2001
Completion Date : 5th March 2003 & 10th March 2003
Tonnage: 3,100 MT (for both platforms )

The first 4 modules / substructure that Brooke under took for Talisman Malaysia Limited ( a Subsidiary of Talisman Energy Group of Canada ). The full load out operations for both the BR-C and BK-C Modules / Substructure will take place within a 7 days time frame.

This particular contract was awarded to Brooke Dockyard as an EPCC Contract, the first ever EPCC undertaken by Brooke in its oil & gas ventures. The duration of the project from design to complete onshore commissioning is 20 months and this was completed within the schedule stipulated.

BK-C & BR-C are both 18 slots drilling platforms with total fabricated weight of around 3,000 tonne including piles and conductors. These platforms will be installed later offshore at the Malaysian – Vietnam waters as part of a Malaysian- Vietnam joint effort to develop offshore oil & gas resources.

Another notable milestone for the 90 over year old corporation has been its remarkable safety reward with a achievement of 820,000 man hours without any lost time incident ( LTI).

We are thankful to the Talisman Malaysia Limited and Petronas for the confidence in awarding us the project particularly the opportunity given to undertake the first design & construction contract for the offshore oil & gas industry.

The award of the contract to Brooke also reflects our relentless capacity to be competitive for these works are not only bidded out to a few Malaysian fabrication yards but also to some established yards in Vietnam.

Project by: Oil and Gas Unit
Last updated: 12/03/2005

 

Hits: myspace counters | Copyright © by www.brookedockyard.com | empowered by eD3