PROJECT LIST

 

Oil and Gas Unit
FABRICATION OF SJQ-A LIVING QUARTERS MODULE & HELIDECK
FABRICATION OF SJQ-A SUBSTRUCTURE
FABRICATION OF SJQ-A TOPSIDES
FABRICATION SERVICES FOR SEDERI TIE-IN MODIFICATIONS
ENGINEERING PROCUREMENT CONSTRUCTION OF B11 LIVING QUATERS MODULE & HELIDECK
FABRICATION OF F23 LIVING QUARTERS MODULE AND HELIDECK
FABRICATION OF F6 LIVING QUARTERS MODULE AND HELIDECK
FABRICATION OF JERNEH-B PLATFORM AND SUBSTRUCTURE
FABRICATION OF SFJT-E SATELLITE PLATFORM & PREFAB. WORKS FOR M3S & G7
Baram Compression and Production Platform BAKP-B Module 2 & 3, Module Support Frame (MSF) and Flare Boom
FABRICATION OF WP-IA TOPSIDES
SFJT-C TOPSIDES
SFJT-C SUBSTRUCTURE
FABRICATION OF SFK-A SUBSTRUCTURE
Serai Subsea Production Manifold, Pressure Vessel & Associated Tie-In Materials
MLNG TIGA PIPELINE PROJECT – SLUGCATCHER III FACILITIES
MLNG TIGA PLANT – CONDENSATE STABILISATION TRAINS
BK-B(BR-C) & BK-C WELLHEAD RISER PLATFORMS AND JACKET
Jintan (JNDRA) Topsides
ANGSI-B Topsides
D35 JT-C Topsides
ST. Joseph Compression Module
MALONG JACKET
MALONG TOPSIDES
Marine Engineering Unit
FABRICATION OF SG NYELONG BRIDGE
42 meter Double Ended Ferry
Steel Hulled 38 meter Hydrographic Survey Vessel
Multi Mission Vessel
Land-based Engineering Unit
Construction Works for the Remaining Works of Durin Bridge, Batang Rajang, Sibu.
Sg. Meradong Bridge

 

 

PROJECTS


Jintan (JNDRA) Topsides

Award Date : 7th September 2001
Completion Date : 26th September 2002
Tonnage : 1500MT

Another Offshore Drilling Platform Completed by Brooke Dockyard. The Jintan (JNDR-A) Topsides Project was awarded by Shell Oil & Gas Malaysia (SOGM) to Brooke Dockyard in September 2001.

The JNDR-A is a drilling cum riser platform which will be situated about 275km offshore Bintulu. The topsides weighing about 1,600MT was completed on schedule on 26th September 2002. The loadout of the topsides is on 27th October 2002 and, upon loadout and seafastening, the topsides will be transported by barge to its offshore destination for installation.

This Project is the second single largest project undertaken by Brooke Dockyard after the 2,000 MT ANGSI-B Topsides project which was completed in June 2001.

Project by: Oil and Gas Unit
Last updated: 12/03/2005

 

Hits: myspace counters | Copyright © by www.brookedockyard.com | empowered by eD3