PROJECT LIST

 

Oil and Gas Unit
FABRICATION OF SJQ-A LIVING QUARTERS MODULE & HELIDECK
FABRICATION OF SJQ-A SUBSTRUCTURE
FABRICATION OF SJQ-A TOPSIDES
FABRICATION SERVICES FOR SEDERI TIE-IN MODIFICATIONS
ENGINEERING PROCUREMENT CONSTRUCTION OF B11 LIVING QUATERS MODULE & HELIDECK
FABRICATION OF F23 LIVING QUARTERS MODULE AND HELIDECK
FABRICATION OF F6 LIVING QUARTERS MODULE AND HELIDECK
FABRICATION OF JERNEH-B PLATFORM AND SUBSTRUCTURE
FABRICATION OF SFJT-E SATELLITE PLATFORM & PREFAB. WORKS FOR M3S & G7
Baram Compression and Production Platform BAKP-B Module 2 & 3, Module Support Frame (MSF) and Flare Boom
FABRICATION OF WP-IA TOPSIDES
SFJT-C TOPSIDES
SFJT-C SUBSTRUCTURE
FABRICATION OF SFK-A SUBSTRUCTURE
Serai Subsea Production Manifold, Pressure Vessel & Associated Tie-In Materials
MLNG TIGA PIPELINE PROJECT – SLUGCATCHER III FACILITIES
MLNG TIGA PLANT – CONDENSATE STABILISATION TRAINS
BK-B(BR-C) & BK-C WELLHEAD RISER PLATFORMS AND JACKET
Jintan (JNDRA) Topsides
ANGSI-B Topsides
D35 JT-C Topsides
ST. Joseph Compression Module
MALONG JACKET
MALONG TOPSIDES
Marine Engineering Unit
FABRICATION OF SG NYELONG BRIDGE
42 meter Double Ended Ferry
Steel Hulled 38 meter Hydrographic Survey Vessel
Multi Mission Vessel
Land-based Engineering Unit
Construction Works for the Remaining Works of Durin Bridge, Batang Rajang, Sibu.
Sg. Meradong Bridge

 

 

PROJECTS


ANGSI-B Topsides

The largest platform ever built by Brooke Dockyard

Client : PETRONAS CARIGALI
Award Date : 1st March 2000
Completion Date : 1st May 2001
Tonnage : 2000MT

Petronas Carigali Sdn Bhd (PCSB) and ESSO Production (M) Inc (EPMI) are the joint venture partners on Angsi Project with PCSB as the operated under the main term and condition of the gas production sharing contract (GPSC).

Angsi-B (ANDP-B) is an oil satellite platform located 6 km west of Angsi – A central processing platform ( ANPG-A) and Angsi-A Drilling & Riser Platform (ANDR-A). ANDP-B is required to develop the western part of Angsi Oil reserve. Full well stream production from ANDP-B will be sent via pipline to ANPG-A and ANDR-A for further processing prior to onwards transmission to the onshore terminals.

ANDP-B will be an unmanned integrated deck with a helideck. It will be a four – legged steel piled jacket platform in a 69m water depth. The platform has 32 conductor slot, well testing and required utilities to support the operations. Gas lifts and water injection, will be supplied form ANPG-A via pipeline, are required to maximize hydrocarbon recovery. The platform is designed for remote monitoring and controls from ANPG-A via distributed control system. Communication and power will be via composite submarine cable from ANPG-A.

Project by: Oil and Gas Unit
Last updated: 12/03/2005

 