PROJECT LIST

 

Oil and Gas Unit
FABRICATION OF SJQ-A LIVING QUARTERS MODULE & HELIDECK
FABRICATION OF SJQ-A SUBSTRUCTURE
FABRICATION OF SJQ-A TOPSIDES
FABRICATION SERVICES FOR SEDERI TIE-IN MODIFICATIONS
ENGINEERING PROCUREMENT CONSTRUCTION OF B11 LIVING QUATERS MODULE & HELIDECK
FABRICATION OF F23 LIVING QUARTERS MODULE AND HELIDECK
FABRICATION OF F6 LIVING QUARTERS MODULE AND HELIDECK
FABRICATION OF JERNEH-B PLATFORM AND SUBSTRUCTURE
FABRICATION OF SFJT-E SATELLITE PLATFORM & PREFAB. WORKS FOR M3S & G7
Baram Compression and Production Platform BAKP-B Module 2 & 3, Module Support Frame (MSF) and Flare Boom
FABRICATION OF WP-IA TOPSIDES
SFJT-C TOPSIDES
SFJT-C SUBSTRUCTURE
FABRICATION OF SFK-A SUBSTRUCTURE
Serai Subsea Production Manifold, Pressure Vessel & Associated Tie-In Materials
MLNG TIGA PIPELINE PROJECT – SLUGCATCHER III FACILITIES
MLNG TIGA PLANT – CONDENSATE STABILISATION TRAINS
BK-B(BR-C) & BK-C WELLHEAD RISER PLATFORMS AND JACKET
Jintan (JNDRA) Topsides
ANGSI-B Topsides
D35 JT-C Topsides
ST. Joseph Compression Module
MALONG JACKET
MALONG TOPSIDES
Marine Engineering Unit
FABRICATION OF SG NYELONG BRIDGE
42 meter Double Ended Ferry
Steel Hulled 38 meter Hydrographic Survey Vessel
Multi Mission Vessel
Land-based Engineering Unit
Construction Works for the Remaining Works of Durin Bridge, Batang Rajang, Sibu.
Sg. Meradong Bridge

 

 

PROJECTS


ST. Joseph Compression Module

Compression Module completed within 8 months

Client : Sarawak SHELL Bhd
Award Date: 10th February 1999
Completion Date : 10th October 1999
Tonnage : 1200MT

This two-deck offshore module for the St Joseph GRS which consists of a compression train with its supporting platform, located at 35 km offshore north-west of Sabah. The very heart of the compression module are the 14 MW Ebara compressor driven by a highly powered 17 MW ABB gas turbine. The re-injection of associated gas into the reservoir is an innovative technology which enables more oil to be produced over its reservoir life whist incidentally signifies Shell’s commitment to sustainable development of Malaysia’s natural resources.

The Gas Re-injection scheme is brown field hydrocarbon recovery scheme which will increase the reservoir pressure and enhance the ultimate oil recovery at the St Joseph fields to around 35 million barrels (MMstb) over its remaining production period of 20 years.

The delivery of this module marks SSPC’s ceaseless endeavour to bring forth new technology to the oil and gas industry in Malaysia. In 1998, SSPC instituted Malaysia’s first ever remotely operated platforms, the Kinabalu KNDP-A which is located 55 km off Labuan Island.

The St Joseph fields began production in 1982 under Production Sharing Contract with PETRONAS. With the renewal of the PSC in 1996, the St Joseph Field is now a joint venture production between SSPC and Petronas Carigali Sdn Bhd.

The completion of the St Joseph Gas Re-injection Module marks the final phase of the onshore works of the project. The final phase of project which consists of the installation, hook-up, commissioning and start up of the module is scheduled for action between the middle of October and towards the end of 1999. The hive of these activities will involve the usage of several heavy lift barges, transportation barge, light craft transits and fast crew boat, all at offshore Sabah Waters.

Project by: Oil and Gas Unit
Last updated: 12/03/2005

 