PROJECT LIST

 

Oil and Gas Unit
FABRICATION OF SJQ-A LIVING QUARTERS MODULE & HELIDECK
FABRICATION OF SJQ-A SUBSTRUCTURE
FABRICATION OF SJQ-A TOPSIDES
FABRICATION SERVICES FOR SEDERI TIE-IN MODIFICATIONS
ENGINEERING PROCUREMENT CONSTRUCTION OF B11 LIVING QUATERS MODULE & HELIDECK
FABRICATION OF F23 LIVING QUARTERS MODULE AND HELIDECK
FABRICATION OF F6 LIVING QUARTERS MODULE AND HELIDECK
FABRICATION OF JERNEH-B PLATFORM AND SUBSTRUCTURE
FABRICATION OF SFJT-E SATELLITE PLATFORM & PREFAB. WORKS FOR M3S & G7
Baram Compression and Production Platform BAKP-B Module 2 & 3, Module Support Frame (MSF) and Flare Boom
FABRICATION OF WP-IA TOPSIDES
SFJT-C TOPSIDES
SFJT-C SUBSTRUCTURE
FABRICATION OF SFK-A SUBSTRUCTURE
Serai Subsea Production Manifold, Pressure Vessel & Associated Tie-In Materials
MLNG TIGA PIPELINE PROJECT – SLUGCATCHER III FACILITIES
MLNG TIGA PLANT – CONDENSATE STABILISATION TRAINS
BK-B(BR-C) & BK-C WELLHEAD RISER PLATFORMS AND JACKET
Jintan (JNDRA) Topsides
ANGSI-B Topsides
D35 JT-C Topsides
ST. Joseph Compression Module
MALONG JACKET
MALONG TOPSIDES
Marine Engineering Unit
FABRICATION OF SG NYELONG BRIDGE
42 meter Double Ended Ferry
Steel Hulled 38 meter Hydrographic Survey Vessel
Multi Mission Vessel
Land-based Engineering Unit
Construction Works for the Remaining Works of Durin Bridge, Batang Rajang, Sibu.
Sg. Meradong Bridge

 

 

PROJECTS


ENGINEERING PROCUREMENT CONSTRUCTION OF B11 LIVING QUATERS MODULE & HELIDECK

Client : Sarawak Shell Bhd
Award Date : August 2007
Completion Date : 10/04/2009
Tonnage : 1050 MT


The B11 Living Quarters Module and Helideck project by Sarawak Shell is the 3rd Living Quarters undertaken by Brooke Dockyard continuing of F6 and F23 LQ projects.

The contract covers the engineering, fabrication, inspection, testing and onshore precommissioning, loadout and sea fastening removal/demolition of existing ELQ, offshore installation/hookup and commissioning of new B11 Living Quarters Module and associated facilities.

For this particular project, Brooke Dockyard collaborates with Emtunga Offshore AB, a Sweden based Living Quarters Specialist for prefab modular section of a 42 Man Light weight stressed skin design Living Quarters.

The Modules prefabricated in 30 ( 3m x 10m) module section in Gothenburg, Sweden and assembled in Brooke Dockyard Fabrication Yard, Sejingkat, Kuching Sarawak.


Project by: Oil and Gas Unit
Last updated: 12/11/2009

 

Hits: myspace counters | Copyright © by www.brookedockyard.com | empowered by eD3