PROJECT LIST

 

Oil and Gas Unit
FABRICATION OF SJQ-A LIVING QUARTERS MODULE & HELIDECK
FABRICATION OF SJQ-A SUBSTRUCTURE
FABRICATION OF SJQ-A TOPSIDES
FABRICATION SERVICES FOR SEDERI TIE-IN MODIFICATIONS
ENGINEERING PROCUREMENT CONSTRUCTION OF B11 LIVING QUATERS MODULE & HELIDECK
FABRICATION OF F23 LIVING QUARTERS MODULE AND HELIDECK
FABRICATION OF F6 LIVING QUARTERS MODULE AND HELIDECK
FABRICATION OF JERNEH-B PLATFORM AND SUBSTRUCTURE
FABRICATION OF SFJT-E SATELLITE PLATFORM & PREFAB. WORKS FOR M3S & G7
Baram Compression and Production Platform BAKP-B Module 2 & 3, Module Support Frame (MSF) and Flare Boom
FABRICATION OF WP-IA TOPSIDES
SFJT-C TOPSIDES
SFJT-C SUBSTRUCTURE
FABRICATION OF SFK-A SUBSTRUCTURE
Serai Subsea Production Manifold, Pressure Vessel & Associated Tie-In Materials
MLNG TIGA PIPELINE PROJECT – SLUGCATCHER III FACILITIES
MLNG TIGA PLANT – CONDENSATE STABILISATION TRAINS
BK-B(BR-C) & BK-C WELLHEAD RISER PLATFORMS AND JACKET
Jintan (JNDRA) Topsides
ANGSI-B Topsides
D35 JT-C Topsides
ST. Joseph Compression Module
MALONG JACKET
MALONG TOPSIDES
Marine Engineering Unit
FABRICATION OF SG NYELONG BRIDGE
42 meter Double Ended Ferry
Steel Hulled 38 meter Hydrographic Survey Vessel
Multi Mission Vessel
Land-based Engineering Unit
Construction Works for the Remaining Works of Durin Bridge, Batang Rajang, Sibu.
Sg. Meradong Bridge

 

 

PROJECTS


FABRICATION OF WP-IA TOPSIDES

Client : Murphy Sarawak Oil Co Ltd
Award Date : 11th March 2003
Completion Date : 15th August 2003
Tonnage : 650MT

Another Fast Track Project, Water Injection Topsides (WP-IA) was completed by Brooke Dockyard in 6 months. The water Injection/Wellhead Satellite Platform (WP-IA) Project was awarded by Murphy Sarawak Oil Co., Ltd on 11th March 2003 to Brooke Dockyard.

The Water Injection/Wellhead Satellite Platform (WP-IA) will be situated at the West Patricia Field located approximately 46 km offshore Bintulu, off the coast of Sarawak, has a water depth of 40 metres. The WP-IA Platform was designed for an injection capacity of 40,000 bwpd.

The WP-IA Platform utilizes the same lightweight four legged structure as used on the WP-PA production facilities. The Jacket was installed by jack-up rig and the topsides will be installed utilizing a float-over method.

The WP-IA topsides weighing 620 tonnes was completed on schedule on 30th August 2003. The loadout of the topsides was completed by 12th September 2003 and, upon seafastening, the topsides will be transported by barge to its final offshore destination. This is the third Fast Track project undertaken by Brooke Dockyard and follows the 200 MT South Furious Topsides and 400 MT Substructure for Sabah Shell Petroleum Co., Ltd, completed in May and June 2001, respectively.

Project by: Oil and Gas Unit
Last updated: 16/07/2008

 