PROJECT LIST

 

Oil and Gas Unit
FABRICATION OF SJQ-A LIVING QUARTERS MODULE & HELIDECK
FABRICATION OF SJQ-A SUBSTRUCTURE
FABRICATION OF SJQ-A TOPSIDES
FABRICATION SERVICES FOR SEDERI TIE-IN MODIFICATIONS
ENGINEERING PROCUREMENT CONSTRUCTION OF B11 LIVING QUATERS MODULE & HELIDECK
FABRICATION OF F23 LIVING QUARTERS MODULE AND HELIDECK
FABRICATION OF F6 LIVING QUARTERS MODULE AND HELIDECK
FABRICATION OF JERNEH-B PLATFORM AND SUBSTRUCTURE
FABRICATION OF SFJT-E SATELLITE PLATFORM & PREFAB. WORKS FOR M3S & G7
Baram Compression and Production Platform BAKP-B Module 2 & 3, Module Support Frame (MSF) and Flare Boom
FABRICATION OF WP-IA TOPSIDES
SFJT-C TOPSIDES
SFJT-C SUBSTRUCTURE
FABRICATION OF SFK-A SUBSTRUCTURE
Serai Subsea Production Manifold, Pressure Vessel & Associated Tie-In Materials
MLNG TIGA PIPELINE PROJECT – SLUGCATCHER III FACILITIES
MLNG TIGA PLANT – CONDENSATE STABILISATION TRAINS
BK-B(BR-C) & BK-C WELLHEAD RISER PLATFORMS AND JACKET
Jintan (JNDRA) Topsides
ANGSI-B Topsides
D35 JT-C Topsides
ST. Joseph Compression Module
MALONG JACKET
MALONG TOPSIDES
Marine Engineering Unit
FABRICATION OF SG NYELONG BRIDGE
42 meter Double Ended Ferry
Steel Hulled 38 meter Hydrographic Survey Vessel
Multi Mission Vessel
Land-based Engineering Unit
Construction Works for the Remaining Works of Durin Bridge, Batang Rajang, Sibu.
Sg. Meradong Bridge

 

 

PROJECTS


Serai Subsea Production Manifold, Pressure Vessel & Associated Tie-In Materials

Client : Shell Oil & Gas Malaysia
Award : 31 October 2002
Completion Date : 18 December 2003

Project Brief

SERAI facilities development consist of two (2) new Subsea Wells at Serai and the topside modification & expansion of M3DR-A to accommodate export of SERAI of SERAI gas from these new wells.

At the SERAI end, a subsea production manifold will gather the wet gas from the two (2) new wells and export to M3DR-A via a new 14" CRA pipeline. The controls of these wells will be by a subsea control system via umbilical through existing M4 (subsea) and M3 facilities. The subsea facilities will include two (2) subsea wellhead, horizontal trees & choke, flowlines and umbilical jumpers, production manifold, umbilical and subsea control modules.

The modification of M3DR-A included structural deck extension and strengthing. The additional equipment will included a test seperator, gas & condensate metering facility, condensate pumps, methanol injection skid and miscellaneous handling equipment.

Project by: Oil and Gas Unit
Last updated: 16/07/2008

 

Hits: myspace counters | Copyright © by www.brookedockyard.com | empowered by eD3